Customer Newsletter - June 2012

If you have trouble reading this message, please click here.

 
  Cadence
 

Xilinx Slashes Verification Time Using Incisive Specman/e Solution

To accelerate its development cycle, Xilinx uses Cadence Incisive Enterprise Simulator with Specman macros for swift IP design testing.

In addition to runtime improvements that save Xilinx 20% to 30% in simulation time, the Specman macro solution is flexible, easy to use, and effectively free as all Enterprise Simulator licenses include a Specman license.


Learn more

seperator

GLOBALFOUNDRIES and Cadence collaborate on DRC+ technology

To guarantee high yield and manufacturability at advanced process nodes, GLOBALFOUNDRIES needed to go beyond traditional design-rule checking (DRC) and develop a new set of incremental design-for-manufacturing (DFM) verification methodologies.

GLOBALFOUNDRIES collaborated with Cadence to pioneer pattern matching-based DRC+ technology, driving faster turnaround times and first-pass-correct silicon.


Watch the video

Blog: DAC Panelists Discuss Success at 28nm and Below

A panel of experts at a Cadence-sponsored Design Automation Conference (DAC) panel provided fresh insights into what it takes to achieve silicon success at 28nm, 20nm and beyond.

Learn how speakers from IBM, Cadence, ARM, Samsung, and GLOBALFOUNDRIES shed new light on business and technology challenges and solutions.


Read blog
View all blogs

 
 
 
Archived Webinars: Industry Leaders Unveil Shared Vision for 20nm

Gain Clarity to Succeed at Advanced Nodes
Watch the webinars

 
PCI-SIG Developers Conference, Santa Clara

Chat with Cadence IP/VIP experts in PCI Express at booth 1
Event details

 
SiliconBlue Technologies Achieves First-Pass Silicon Success

Leverages Cadence TSMC-certified DFM Services
Read more

 


© 2012 Cadence Design Systems, Inc. All rights reserved.

Cadence respects your online time and privacy.
To unsubscribe from all future Cadence email communications, please reply to this message and type
UNSUBSCRIBE in the subject line. Please allow up to seven (7) business days for your request to be processed.
Cadence Design Systems, Inc. | 2655 Seely Avenue San Jose, CA 95134