Home > Community > Forums > Digital Implementation > Pipeline timing analysis

Email

* Required Fields

Recipients email * (separate multiple addresses with commas)

Your name *

Your email *

Message *

Contact Us

* Required Fields
First Name *

Last Name *

Email *

Company / Institution *

Comments: *

 Pipeline timing analysis 

Last post Mon, Nov 18 2013 7:05 AM by fitz. 0 replies.
Started by fitz 18 Nov 2013 07:05 AM. Topic has 0 replies and 801 views
Page 1 of 1 (1 items)
Sort Posts:
  • Mon, Nov 18 2013 7:05 AM

    • fitz
    • Top 150 Contributor
    • Joined on Wed, Aug 4 2010
    • Kanata, Ontario
    • Posts 52
    • Points 695
    Pipeline timing analysis Reply

    How to report overall timing through a complete pipeline, start to finish, to determine if the any stages can be removed.
    i.e. -from start_ff -through pl1ff -through pl2ff -through pl3ff -through pl4ff -to finish_ff ; reports total slack = +2.5 clock periods = safely remove two stages.

    RTL design reuse has pipeline instantiated specifically for  previous layout, the current layout is much smaller and the pipeline probably has too many stages.

    I need to determine the worst / critical path in a 24k wide,  8 stage,  randomly placed pipeline.

    Shawn stumped

    Filed under:
    • Post Points: 5
Page 1 of 1 (1 items)
Sort Posts:
Started by fitz at 18 Nov 2013 07:05 AM. Topic has 0 replies.