Home > Community > Blogs > Industry Insights > new incisive vmanager keeps verification costs in check
 
Login with a Cadence account.
Not a member yet?
Create a permanent login account to make interactions with Cadence more convenient.

Register | Membership benefits
Get email delivery of the Industry Insights blog (individual posts).
 

Email

* Required Fields

Recipients email * (separate multiple addresses with commas)

Your name *

Your email *

Message *

Contact Us

* Required Fields
First Name *

Last Name *

Email *

Company / Institution *

Comments: *

New Incisive vManager Keeps Functional Verification Costs in Check

Comments(0)Filed under: Metric-driven verification, Incisive, Verisity, verification planning, Incisive Enterprise Manager, vManager

Functional verification costs are skyrocketing at 40nm and below, and the only solution is to dramatically increase verification productivity. Cadence this week (Feb. 24, 2014) is responding with the Incisive vManager solution, an all-new verification planning and management environment built on a client-server architecture and an SQL database.

At this point you may be saying, "I've been using vManager for years" or "I've heard of vManager before." That was, in fact, the original name of a product introduced by Verisity before Cadence acquired the company in 2005. Cadence renamed the product "Incisive Enterprise Manager," and for eight years now it has been helping users run regression suites and analyze results using a metric-driven verification (MDV) methodology (right). The new Incisive vManager does that too, but it has capabilities that go far beyond the Incisive Enterprise Manager.

"We are introducing a brand new solution that is going to revolutionize verification planning and management," said John Brennan, product marketing director at Cadence. That's a bold statement, but it's based on some important new capabilities in Incisive vManager, including the following:

  • A client/server architecture allows multiple users to interact concurrently with vManager, facilitating collaboration. Also, users can manage multiple projects within the same environment. (Incisive Enterprise Manager is single-user, single-project).
  • A commercial SQL database provides much more scalability than file-based solutions like Incisive Enterprise Manager. According to Brennan, the new vManager has "basically unlimited capacity" when it comes to the number of jobs that can be executed and run, and how much coverage users can manage.
  • The new vManager is not just about simulation. It provides multi-engine support by operating with the Incisive Enterprise Simulator, Incisive Formal Verifier, and Palladium XP acceleration and emulation platform.
  • Multi-analysis features integrated into vManager make it possible to analyze functional and code coverage, test failures, perform failure triage, create and analyze executable plans, and find coverage holes and design problems.
  • vManager has new features for tracking verification progress over time.
  • With new interfaces and APIs, and a commercial database, vManager provides a more extensible solution than a file-based environment.

The diagram below provides a closer look at the new Incisive vManager solution. Four "activity centers" are at the top of the diagram. The Planning Center allows users to build executable verification plans (vPlans). The Regression Center lets users submit jobs to the compute farm. The Analysis Center shows whether features in the design have been covered or not. The new Tracking Center makes it possible to see whether a project is progressing properly. Again, it's all built upon a client/server architecture and an SQL database.

So what is driving demand for this kind of solution? Brennan cited three top-level business concerns. One is the age-old question of when verification is done. Another is the high cost to tapeout with any chip at 40nm or below, with verification costs increasing faster than the cost of design itself. A third concern is that a functional bug may force a re-spin, or in worst case a recall, if the bug is not found in time.

Brennan said that Incisive vManager helps alleviate these concerns by providing schedule predictability, verification productivity, and improved quality. Most projects, he said, have up to a 50% uncertainty about verification completion. But vManager "provides exact details to determine exactly where you are, feature by feature, inside your chip."

Verification productivity is enhanced by a GUI that lets you see where the problems are, so you can shift resources if needed and get back to your schedule. Incisive vManager also optimizes testing on compute farms, and supports formal engines and acceleration. Finally, vManager provides increased quality because the more metrics you use, the more complete the testing.

Brennan said that vManager "allows you to easily see where the most critical failures in the design are, so you're not wasting cycles continuing to test things that are not really in a problem area." Users can work on the most critical failures, shift verification resources as needed, eliminate redundant cycles, and fill coverage holes.

Early customers have reported the following results:

  • Up to 30% time savings due to planning
  • 25% better compute farm utilization
  • 60% reduction in verification time
  • 10X improvement in bug discovery rate

In short, Brennan said, the use of Incisive vManager with a metric-driven verification methodology can result in a 2X improvement in verification productivity. And that improvement will be very welcome for the gigascale IC designs that are right around the corner.

Further information, including a white paper and a data sheet, is available on this landing page.

Richard Goering

Related Blog Post

DVCon 2013 Expert Panel: How to Succeed with Verification Planning

 

 

Comments(0)

Leave a Comment


Name
E-mail (will not be published)
Comment
 I have read and agree to the Terms of use and Community Guidelines.
Community Guidelines
The Cadence Design Communities support Cadence users and technologists interacting to exchange ideas, news, technical information, and best practices to solve problems and get the most from Cadence technology. The community is open to everyone, and to provide the most value, we require participants to follow our Community Guidelines that facilitate a quality exchange of ideas and information. By accessing, contributing, using or downloading any materials from the site, you agree to be bound by the full Community Guidelines.