Home > Community > Blogs > Industry Insights > why multi mode multi corner mmmc eco closure requires a new signoff approach
 
Login with a Cadence account.
Not a member yet?
Create a permanent login account to make interactions with Cadence more convenient.

Register | Membership benefits
Get email delivery of the Industry Insights blog (individual posts).
 

Email

* Required Fields

Recipients email * (separate multiple addresses with commas)

Your name *

Your email *

Message *

Contact Us

* Required Fields
First Name *

Last Name *

Email *

Company / Institution *

Comments: *

Why Multi-Mode, Multi-Corner (MMMC) ECO Closure Requires a New Signoff Approach

Comments(1)Filed under: Industry Insights, encounter timing system, Encounter, ECO, STA, Cadence, QRC, signoff, physically aware, ETS, PVT corners, MMMC, Molina, timing signoff, Ruben Molina, hold, setup, process corners, ECO flow, ECO loops, static timing analysis, multi-mode multi-corner

In the semiconductor design flow, engineering change orders (ECOs) are as inevitable as death and taxes. While this has always been the case, ECO timing closure is becoming increasingly difficult as the number of operating modes and process-voltage- temperature (PVT) corners skyrockets. What's needed is a new "physically aware" MMMC ECO timing closure flow.

I recently talked to Ruben Molina, product marketing director for timing signoff at Cadence, about the limitations of the traditional IC timing closure flow. He noted that today's flows are typically comprised of point tools. You run one tool, export a file, and then go to the next tool. Eventually you get a timing report and you have to figure out how to fix the violations.

Of course, changing anything in the layout can cause new timing problems, so many ECO loops may be needed. The following diagram illustrates some of the challenges of the traditional flow.

Figure 1 - A typical timing closure flow

Molina observed that closing a design often takes 10 or more ECO iterations. "Those iterations can last anywhere from a day or two to several days. It could be a week. Add it all up and anywhere from one month to two or three months is spent in this final timing closure phase."

Too Many Views

One reason timing closure takes so long is that as process nodes shrink, there are more and more "views" to consider. A "view" is a combination of a mode (say, functional mode "1") and a corner (such as worst-case temperature) that is required for a particular timing check, such as setup or hold. A quick look at theoretically possible corners shows how quickly things can add up:

  • Voltage: Best case, worst case, typical = 3 corners
  • Temperature: Best case, worst case, typical = 3 corners
  • Process for cells: Fast-fast, slow-slow, fast-slow, slow-fast, typical = 5 corners
  • Process for interconnect: Max C, Min C, Max RC, Min RC, typical = 5 corners

Multiply this out and you get 3X3X5X5=225 corners. And that's not even considering operational and test modes. Throw in 6 modes and you're well over 1,000 views. At 20nm, by the way, modeling mask shift variation due to double patterning could increase extraction corners by as much as 3X.

In practice, as Molina points out, design teams don't run timing analysis and optimization over every possible view. At 28nm, for instance, a design team might look at 16 operational corners. The total number of views for signoff might be in the 64 to 128 range. In implementation, however, this number may be reduced to 8 or 16 to keep things manageable.

A New MMMC ECO flow

So what's needed to make MMMC timing closure more manageable? One requirement is an MMMC analysis solution that can scale with an increasing number of views. And one way to handle this is to run multiple views in parallel using distributed processing in a compute farm.  (For example, the Cadence Encounter Timing System supports both distributed processing and multi-threading.)

Another approach is to leverage "commonalities" between the modes and corners, and avoid repeating tests that might not be necessary. For example, if there are no failures at a worst-case corner, it might be safe to assume there will be no failures at a nominal corner.

Most important, however, is an MMMC ECO flow that is physically aware. This means that the ECO file that is written out not only represents logical changes in the netlist, but also specifies the coordinate information for where cells should be placed. As a result, Molina said, "we know where all the vacancies are in the design, and we know that if we locate a cell in a given location, it will go exactly where we want it to go. If we fix 100 violations, then 99 will still be fixed after implementation."

As shown below, the Cadence MMMC timing closure signoff flow is physically aware. It leverages the Encounter Digital Implementation (EDI) System for layout optimization, QRC Extraction for multi-corner extraction, and Encounter Timing System for MMMC static timing analysis, all without external file transfers. "For a design that has tens of thousands of hold violations, we are able to fix 99% in one iteration, which is an overnight run," Molina said.

Figure 2 - Cadence offers physically-aware MMMC timing closure signoff flow

This flow can fix hold and design-rule violations today, and upcoming versions will provide automated fixing for setup violations, glitches, and leakage. The "holy grail," Molina said, is to reach a point where there is no need to export an ECO file, because ECOs will all be handled automatically in the implementation tool. "We are in the first evolution of what will eventually become a completely automated signoff quality optimization within a single-step IC design flow," he said.

Richard Goering

 

 

Comments(1)

By neveen on October 19, 2012
what are the cases available in MMMC ..i had seen WCC also as a case ...what is meant by wcc case..
thnaks

Leave a Comment


Name
E-mail (will not be published)
Comment
 I have read and agree to the Terms of use and Community Guidelines.
Community Guidelines
The Cadence Design Communities support Cadence users and technologists interacting to exchange ideas, news, technical information, and best practices to solve problems and get the most from Cadence technology. The community is open to everyone, and to provide the most value, we require participants to follow our Community Guidelines that facilitate a quality exchange of ideas and information. By accessing, contributing, using or downloading any materials from the site, you agree to be bound by the full Community Guidelines.